  • 商品名称: DL型泵
  • 上架时间: 2016/11/8 20:39:11
  • 浏览次数:

DL型泵

002 - 副本.jpg

进水段

2机械密封泄流软管

3.中段

4密封环

5.叶轮挡套

6.叶轮

7.平衡鼓

8.平衡套

9出水段

10.轴

11填料体

12.轴套(软填料轴套或机械密封轴套)

13.挡水套

14.轴承盒

15推力球轴承

18.轴承盖

17联接架

18联轴器组

19水中轴承盖

20.水中轴承套

21水中轴承

22下轴套

23.卡环

24.卡环套

25.导叶套

26.导叶

27.出水段导叶

28.灌水一回水管

29.填料压盖或机械密封压盖

Inlet section

2 mechanical seal vent hose

3 middle section

4 seal ring

5 impeller retaining sleeve

6 impeller

7 balance drum

8 balance set

9 water outlet section

10 axis

11 filler

The 12 sleeve (sealing sleeve sleeve or soft packing machinery)

13 block water jacket

14 bearing box

15 thrust ball bearing

18 bearing cover

17 coupling frame

18 coupling group

19 water bearing cap

20 water bearing sleeve

21 water bearing

22 shaft

23 clasp

24 card ring sleeve

25 guide vane sleeve

26 guide vane

27 outlet guide vane

28 irrigation and a return water pipe

29 packing gland or mechanical seal gland

1.概    述

    I.l  DL系列泵是立式、单吸、多级、分段式离心泵,供输送清水及物理化学性质

似于水的80℃以下的液体之用。DLR型热水泵输送介质温度为150℃以下。

    1.2  泵为立式安装,具有结构紧凑、噪声低、运转安全、平稳,安装维修方便,占

面积小的特点。

    1.3  多级多出水口离心泵是在DL型泵的基础上结合用户的使用情况,以及公安部

防规范有关要求,并严格按照JB/T2809 - 89标准进行设计制造的新一代产品。

    1.4应用范围:

    该型泵特别适用于高低层建筑的住宅、医院、旅馆、百货大楼,办公大楼等的给排水

消防用水、远距离输送及生产工艺循环中用水、其中多出水口泵可用于一泵多用的场合,

约投资。

    1.5  工作条件:

    ①可输送清水或物理化学性质类似于清水的无腐蚀性介质,其固体不溶物体积不超过

位体积的0.l℃,如介质带有细小颗粒的请在订货时予以说明。

    ②介质温度:DL≤80℃,DLR≤150℃。

    ③最大工作压力不大干2.5MPa.即系统压力=人口压力+闭阀工作时的压力≤2.5MPa

    ④周围环境的温度应低于40c,相对湿度低于95%。

    1.6型号意义:

    如:65DL×5、65DLR×5

    65——进水口直径(毫米)

    DL -立式多级分段式离心泵,DLR立式多级分段式热水离心泵

    5-叶轮数量

    1.7  本系列泵所执行的技术标准是:JB/TQ809-89《立式多级泵型式与基本参数*

    GB5657-95  《多级离心泵技术条件》。

    1.8  泵的旋转方向,从电机端往下看,泵为逆时针方向旋转。

    1.9  多出水口说明

    多出口流量分布图

1 Overview

DL I.l series pumps are vertical, single suction, multi-stage, sectional type centrifugal pump for conveying water and physical and chemical properties

A liquid that is similar to the water below 80 degrees Celsius. DLR type hot water pump delivery medium temperature is below 150.

1.2 pump for vertical installation, with compact structure, low noise, safe operation, smooth, easy installation and maintenance, accounting

Characteristics of small area.

1.3 multi outlet centrifugal pump is used in conjunction with the user based on DL type pump, and the Ministry of public security

Anti specification requirements, and strictly in accordance with the JB/T2809 - 89 standard for the design and manufacture of a new generation of products.

1.4 scope of application:

This type of pump is particularly suitable for the water supply and drainage of buildings, hospitals, hotels, department stores, office buildings and so on.

Fire water circulation, long-distance transportation and production process in water, which can be used for a multi outlet pump pump with multiple occasions,

About investment.

1.5 working conditions:

Can transport water or physical and chemical properties similar to the clear water of the non corrosive media, the volume of solid insoluble matter does not exceed

Bit volume of 0.l C, such as medium with small particles, please note that when ordering.

The temperature of the medium: DL is less than or equal to 80 DEG C, DLR is less than or equal to 150 DEG C.

The maximum working pressure not more than 2.5MPa. the system pressure = population pressure + closing valve when working pressure is less than 2.5MPa

The ambient temperature should be lower than 40C, the relative humidity is less than 95%.

1.6 model significance:

Such as: 65DL x 5, 65DLR x 5

65 water inlet diameter (mm)

DL - vertical multi-stage centrifugal pump, DLR vertical multi-stage centrifugal pump

5- impeller number

1.7 the technical standards for this series of pumps are: JB/TQ809-89 vertical multi-stage pump type and basic parameters.

GB5657-95 "multi stage centrifugal pump technology conditions".

1.8 pump rotation direction, from the motor side down, the pump is counter clockwise rotation.

More than 1.9 outlets that

Multiple outlet flow distribution map

015.jpg

1.  双出水口单独出水时

  即:  H1 =H·N1

2  职出水口同时出水时

  即:  H2=H·N2

其单级扬程与设计单级扬程相同。

H2=H2·N2

其单级扬程与各出永口的流量值(即阀门开度)有关

  Hl=H2·N2+H1·(N1 -N2)

  注:在进行工程计算时,用户可根据所选泵性能及条件要求确定各个出水口的流量或是扬

程(每个出水口只能先定一个参数),我公司即可提供套的运行数据,请在订货时予以说明。

2.结构说明

    2.1  DL型泵为立式结构,其吸口位于进水段上(泵的下部),吐出口位于出水段上

(泵的上部),均呈水平方向布置。可根据使用扬程的需要增减水泵级数。根据安装使用不

同,出水段可旋转90°180°270°等四个方位,以调整吐出口的安装位置。

    2.2  DL型泵的主要零件有:进段、中段、出水段、填料体、叶轮,导叶、出水段

导叶、轴、轴承、轴套,密封环、叶轮挡套、平衡鼓、平衡套,连接架等。

    a进水段、中段、出水段、导叶、出水段导叶、填料体均为铸铁制成,共同形成泵的工

作室。

    b叶轮为铸铁制成,液体沿轴向单侧进入,由于叶轮前后受压不等,必然存在轴向力,

此轴向力绝大部分由平衡鼓来承担,其余小部分残余轴向力由轴上端的向心推力球轴承来承

受,

    c轴为优质碳钢制成,中间装确轮、叶轮挡套、平衡鼓和轴套,用键和轴套螺母固定

在轴上组成为转子部件,轴的一端装有下轴套,与塑料轴承相配合,另一端装有向心推力球

轴承,借以支承转子部件,其上安装联轴器部件与电机直接连接。

    d.平衡鼓、平衡套两者组成泵的平衡装置,磨损后可以更换。

    e.轴套为优质碳钢制成,位于填科室处,起护轴作用。为防止大量液体流失,轴封不仅

能用软填料,而且可与机械密封互换,当用软填料密封时,轴套磨损后可以更换。

  轴封为机械密封时,采用平衡室内的压力水进行润滑和冷却,泄流水由橡胶管引入进水

管。

  轴封为填料密封时,出水段上VJ 38”软管接头,用于把填料体中漏出的水通过软管排放

到地沟里,以保持水周围场地的整洁。

  f泵上端轴承采用钙基黄油润滑。

  g.DLR型热水泵的上部填料室和轴承采用常温清水冷却,冷却水的进口在填料室部位,

出口在轴承部位(下进上出),出、进水口皆以Sp3/8管螺纹与冷却水管网相连。

31部件组装

3.泵的装配与拆卸

 

 

  a.将防砂管插入进水段孔内。将水中轴承装入水中轴承套内,并装在进水段上。

  b装导叶套装到导叶上,然后将导叶装到所有的中段上。

  c.将平衡套压在出水段上,并装上出水段导叶。

  d在填料体上拧好双头螺栓,装上填料和填料压盖。

  e.装好灌水回水管部件。

  £在轴上嵌上短键,将下轴套穿人装上,并用挡圈和螺栓压紧固定之。将两半卡环放{

轴上,装上卡环套。

  g.将电机联轴器装到电机上。

  3.2总装:

  a将轴穿入进水段,并将键放在轴键槽内,顺轴装上第一级叶轮和叶轮挡套。

  b将已装好导叶的的中顺轴装在出水段上,再装上第二级键,叶轮和叶轮挡套,重复【

上步骤,直至将所有键、叶轮,叶轮挡套和中段装完。

    c.装出水段装在中段上,再装上平衡鼓。

    d.将填料体顺轴装在出水段上,用拉紧螺栓将进水段、中段、出水段和填料体紧固在

起。

    e.在轴上嵌上短键,装上轴套。轴封为机械密封时,应连同轴套装好,然后穿在轴上

并用密封压盖固定之。

    f.装入挡水套,将轴承盒装在填料体上,并用螺栓紧固。

    g.装上向心推力球轴承,并套上轴承垫圈,再装上第二个向心推力球轴承,并用螺母

固。

    h.往轴承盒内注入适量黄油,并将纸垫套在轴承盖上,将轴承盖装到轴承盒上,并用

栓紧固,再装上泵联轴器,并用手盘动转子,检查转子是否灵活。

    i将联接架装在填料体上,用螺母紧固之,并在联接架上安装好电机。

    j.在泵上装好灌水回水管部件,如轴封为机械密封,还应装上机械密封泄水用的泄流

管。

    k.装上联轴器柱销和填料。装好放气旋塞、黄油杯和所有的丝堵。

    3.3  泵的拆卸按上述相反步骤进行。

4.安装、起动、运转和停止

  41安装时的注意事项

  a.用水平仪检查泵的基础,泵的地脚螺栓拧紧后,再检查泵的法兰盘平面是否垂直。

  b.安装管路时,进、出水管路都应有自己的支架,不应使泵的法兰盘受到过大的压力

断裂。

  c.泵出口安装闸阀和止回阀的顺序是:泵出口——闸阀——止回阀——出水管

  d.对装填料密封的泵,安好3/8”软管(用户自备).把填料体的泄漏水排人地沟。对装

机械密封的泵,检查一下泄流软管(随机发货)是否安装正确(上端接填料体处,下端接进

水法兰盘)。

e.在输送热水时,泵的进口压力不应低于下表的规定,以免发生汽蚀。

  4.2  起动前的准备。

  a.在轴承盒内加入钙基黄油(此后就用外面的黄油杯补充)。

  b.拆下联轴器的柱销,试开电机,检查电机转向是否与泵相符。也可以在泵内灌满引水

时,点动电机。严禁车幂内无水的情况下起动水泵检查电电机转向。

  4 3起动

  a.打开出口法兰处的放气旋塞,打开灌水一回水管路上的截止阀,通过引水碗向泵内灌

注引水。若进口部分有一定压力时,则打开进口闸阀,向泵内注水。

  b关闭吐出管路上的闸阀及压力计旋塞。

  c.起动电机,打开压力计旋塞。

  d.压力计显示出压力后,打开真空计旋塞,并逐渐打开出口闸阀,直到获的所需压力为

止。

  4.4运转

  ·a.泵长期运转时,流量不能超过性能表中规定的最大流量数值故出口管路阻力较小时,

泵的出口闸阀不能全部敞开,以免电机过载。

  b.在运行中,泵的轴承温度不能超过外界温度35℃,极限温度不能大干80℃。

  c.填料室内正常漏水,以每分钟20-40滴为宜。

  d,定期检查联轴器的橡胶弹性圈,若有损坏,应及时更换。

  e泵在运转中发现有不正常的噪声时,应立即停车检查。

  4 5停止

  a泵停止运转的顺序是:关闭出口管路上的闸阀——关闭真空计旋塞——切断电源停止

电机运转——关闭压力计旋塞。

  b各季冷冻季节,短期停泵时,应拧开进水段上的丝堵和下部水中轴承盖上的长丝堵,

放净泵内存水。

  c.泵经长期运转后,若流量和扬程有明显的下降时,应拆开更换已磨损的零件。

  d.长期停止用泵时,应将泵解体擦干水份,去除锈垢,涂上防锈油脂,重新组装好并妥

善保存

1 double outlet water alone

That is: =H N1 H1

At the same time, the water outlet 2.

Namely: H2=H and N2

The single stage head is the same as the design of single stage head.

N2 and H2=H2

The single stage head and the flow value of each outlet (that is, the valve opening)

N1, N2+H1 (-N2 Hl=H2)

Note: in engineering calculation, the user can according to the selected pump performance requirements and determine the outlet flow or Yang

Cheng (each outlet can only first set a parameter), our company can provide a full set of operation data, please indicate in order.

2 structure description

2.1 DL type pump is a vertical structure, the intake port is located in the lower part of the pump (pump), the outlet is located in the outlet section

(the upper part of the pump), which is arranged in a horizontal direction. According to the need to increase or decrease the use of pump series. According to the installation and use of

At the same time, the water can be rotated 90 degrees, 180 degrees, 270 degrees, four degrees, in order to adjust the installation position of the outlet.

2.2 the main parts of DL type pump are: the water inlet section, the middle section, the water outlet section, the filling body, the impeller, the guide vane and the water outlet section.

Guide vane, shaft, bearing, sleeve, sealing ring and the impeller block sets, balancing drum, balancing sleeve, connecting frame etc..

The a water inlet section, the middle section, the water outlet section, the guide vane, the guide vane of the water outlet section and the filling body are all made of cast iron.

Operating room.

B impeller is made of cast iron, the liquid along the axial side entry, due to the impeller before and after compression, there is a certain axial force,

The vast majority of this axial force is assumed by the balance drum, and the remaining small part of the residual axial force is supported by the radial thrust ball bearing at the upper end of the shaft.

By,

The c axis is arranged in the middle of high-quality carbon steel, the impeller, the impeller block sets, balancing drum and the sleeve, and the sleeve nut is fixed with key

The shaft is composed of rotor, one end of the shaft with shaft, with plastic bearing, the other end is provided with radial thrust ball

Bearing, in order to support the rotor parts, the installation of coupling parts and motor directly connected.

D. balancing drum, the balance of the two components of the pump balance device, can be replaced after wear.

E. sleeve for high-quality carbon steel, located in the Department of nurse at filling, axis. In order to prevent the loss of large amounts of liquid, not only seal

Can use soft packing, and can be interchangeable with mechanical seal, when the seal with soft filler, the sleeve can be replaced when it is worn.

Seal mechanical seal, lubrication and cooling water by the pressure balance chamber, the water discharge by the rubber tube into the water

Tube.

Seal packing seal, water segment VJ 3, 8 "hose connectors, for filling in water leakage through the discharge hose

To the trench, in order to keep the water clean and tidy.

F pump upper end bearing using calcium base grease lubrication.

G.DLR type hot water pump of the upper packing chamber and bearing water cooling at room temperature, cooling water inlet in the filling chamber,

In the export of bearing parts (lower upper), a water outlet and a water inlet pipe is connected with Sp3/8 and the cooling water pipe network thread.

31 component assembly

3 pump assembly and disassembly

A. the sand control pipe is inserted into the hole of the water inlet section. The water bearing is arranged in the water bearing sleeve, and is arranged on the water inlet section.

The B is mounted on the guide vane, and then the guide vanes are arranged on the middle part of the guide vane.

C. will balance the casing pressure in the water, and installed on the outlet section of the guide vane.

D in the packing body is screwed stud, mounted on the packing and packing gland.

E. installed irrigation return pipe.

F in the shaft block short key, will be installed on the wear sleeve, and fixed by the pressing ring and bolt. Put the two halves of the ring

On the shaft, fitted with a ring sleeve.

G. the motor shaft coupling to the motor.

3.2 assembly:

The a shaft penetrates into the water intake section and click on the keyway, along the shaft mounted on the first stage impeller and the impeller block sets.

B will be installed the Zhongshun guide vane shaft is arranged in the water segment, and then loaded on second keys, the impeller and the impeller block sets, repeat [

The upper step, until the all keys, impeller, impeller and the middle of the impeller block.

C. put on the middle of the water, and then put on the balance drum.

The packing body is arranged on the water outlet section along the axis of the D., and the water inlet section, the middle section, the water outlet section and the stuffing body are fixed with a tension bolt.

Play.

E. on the shaft with short keys, fitted sleeve. Seal mechanical seal, should be connected coaxially sheathed, and then put on the shaft

And the fixed sealing gland.

F. into the water baffle jacket will be packed in the packing bearing body, and bolt.

G. fitted with radial thrust ball bearings, and set on the bearing ring, and then fitted with second radial thrust ball bearings, and with the nut

Solid.

H. to the bearing box into the amount of butter, and put the paper pallet on the bearing cover, the bearing cap is fitted to the bearing box, and use

The fastening bolt, and then put on pump coupling, and hand the rotor, check whether the flexible rotor.

I the connecting frame is arranged on the packing body, and is fixed by a nut, and a motor is arranged on the connecting frame.

J. return pipe in the pump with good irrigation, such as the seal mechanical seal, should also be installed on the discharge outlet for mechanical seal

Tube.

K. fitted with coupling pin and packing. Installed vent plug, butter cup and all.

3.3 the removal of the pump according to the above steps to carry out.

4 install, start, run and stop

41 attention to installation

A. basic level check pump, screw bolts, and then check the pump flange plane is vertical.

B. installation pipeline, inlet, outlet pipe should have their own support, should not be too much pressure on the flange of the pump

Crack。

C. pump outlet valve and check valve installation order: Pump - valve - check valve - outlet pipe

D. on the packing seal pump, well 3/8 "hose (user owned). On the assembly

The mechanical seal of the pump, check the discharge hose (random delivery) is correctly installed (at the lower body is connected to the upper end of filler, into

Water blue).

E. in the delivery of hot water, the pump inlet pressure should not be less than the provisions of the table, so as to avoid cavitation.

4.2 preparation before starting.

A. in the bearing box to add calcium based butter (then use outside the butter cup to add).

B. remove the shaft coupling pin, try to open the motor, check whether the motor is in conformity with the pump. Can also be filled with water in the pump

Point moving motor. The power of the car is strictly prohibited in the case of water pump check the motor to check the electric motor.

43 starting

A. open the vent cock at the outlet flange, open the water outlet pipe on the way of the cut-off valve, through the water bowl to pump irrigation

Water injection. If the import part of a certain pressure, then open the inlet valve, the pump to the water injection.

B shut off valve and pressure gauge cock.

C. starting motor, opening pressure gauge cock.

D. pressure gauge shows the pressure after the opening of the vacuum gauge, and gradually open the outlet valve until the required pressure is

Check.

4.4 run

A. pump for a long time, the flow rate can not exceed the maximum flow rate specified in the performance table so that the resistance of the outlet pipeline is relatively small,

Pump outlet valve can not be fully open, so as to avoid motor overload.

B. in the operation, the bearing temperature can not pump more than the outside temperature is 35 degrees centigrade, the temperature limit cannot be more than 80 DEG C.

C. filler room is normally leaking, 20-40 drops per minute is appropriate.

D, regularly check the rubber elastic ring coupling, if there is damage, should be replaced in time.

E pump in operation was found to have abnormal noise, should immediately stop the inspection.

45 stop

The order in which the a pump stops running is to close the gate valve on the outlet pipe -- to shut off the vacuum gauge cock -- to cut off the power supply.

Motor running - off pressure gauge cock.

The B season freezing season, when the pump stops short, unscrew the inlet section of the filament should plug and the lower part of the bearing cover of water plugging,

Put clean water pump.

C. pump after long-term operation, if the flow and head have a clear decline, should be open to replace the worn parts.

D. long-term stop using the pump, the pump should be disintegrated dry water, remove rust, rust grease coating, re assembled and properly

Preservation of good

5.可能发生的故障及其解决方法

5 possible failures and their solutions

88888888.png

6.其    他

  6.1  成套供应范围:泵一台,电机一台。根据用户要求,可供应底阀、止回阀闸阀和

进、出口接管的带螺纹的法兰盘,以及各种易损零件。

  6.2  其他成套供应项目:根据用户要求,可随机提供供应用于噪声、减振的柔性联接

件(橡胶管接头和基础隔振垫。)

  6.3  随机技术文件:泵安装使用说明书一本、泵产品合格证一份、电机产品合格证一

份、装箱单一份。

  6.4  质量保证:在泵的过流零件材质符合介质的要求,用户恰当地遵守保管和使用规

则的条件下,从制造厂发货之日起12个月内,连续运转不超过6个月,产品因制造不良而

发生损坏或不能正常工作时,本厂免费为用户更换或修理产品或零件。易损件磨损不在此

限。

6 other

6.1 complete sets of supply: pump a, motor. According to user requirements, can supply the bottom valve, check valve and gate valve

Inlet and outlet pipes with threaded flanges, and various vulnerable parts.

6.2 other sets of supply projects: according to user requirements, can be used to provide a random supply of noise, vibration damping flexible connection

Part (rubber pipe joint and base vibration isolation pad.)

6.3 random technical documents: the pump installation manual, a pump products, a certificate, a certificate of electrical products

Packing and packing list.

6.4 quality assurance: the flow of the pump parts material in line with the requirements of the media, the user to comply with the appropriate storage and use of the rules

Under the conditions, from the date of delivery of the manufacturing plant within 12 months, the continuous operation of not more than 6 months, the product due to poor manufacturing

The factory is free to replace or repair the products or parts for the user when it is damaged or is not working properly. Wear of wearing parts is not here

Limit.